Main Office & Wailuku Branch at Kehalani Village Center

Headquarters Journey

Maui County FCU's new main office and Wailuku Branch will replace the Wili Pa Loop location. The new 26,100 square foot location will feature a drive-up ATM, safe deposit boxes and a community room. When completed the building will be able to accommodate up to 90 employees and have ample parking with 130 stalls. This new building will enable us to be more efficient in serving our nearly 20,000 members, allow us to centralize our consumer loans and human resources personnel who are currently housed in a separate location, and position the organization for future growth.

May 30, 2023

Elected Officials Visit

Mahalo to Senator Gil Keith-Agaran and Representative Troy Hashimoto for taking the time to tour our new location. We're honored to be presented with a certificate from the Hawaii`i State Legislature.

May 11, 2023

Drive Thru ATMs Up

Woo hoo, both drive thru Smart ATMs are now available. The drive up teller will be open once we're fully staffed in our branches. Don't forget that you'll need to insert your card the long, landscape orientation on all of our ATMs.

April 11, 2023

Blessing Event

As part of our public blessing event, we're honored to be able to present our new neighbors, Ke Hale a Ke Ola Homeless Resource Center, with a donation of $5,000 to help serve the needs of the homeless and hungry on Maui.

March 28, 2023

We're Open!

There's still finishing work being completed throughout the building, but we received our Certificate of Occupancy and are open to serve you Monday - Friday, 8:30am - 4:30pm. Please pardon the construction noise at times.

March 24, 2023

Drive Thru ATMs In

Our three Smart ATMs are installed... two drive thru and one in the Branch entrance. We're still working to get all of them up and running. Currently the drive thru ATM on the building side lane is working. We'll also have a drive thru teller in the future.

March 3, 2023

We're on the Move

The relocation of our main office from Wili Pa Loop to Kehalani Village Drive has begun. First to move is our Consumer Loans team, to be followed by Accounting, Collections, Human Resources, Marketing and Mortgage. 

February 1, 2023

Interior Graphics

Signs of things to come... the interior of the branch is painted and ready for the environmental graphics to go in. You'll find this graphic in our community room, which can accommodate our entire team for training, up to 100 people.

January 13, 2023

Hello Cabinets

The long-awaited and much delayed cabinets have finally arrived and are being installed. The cabinets are crucial in supporting the countertops and sink fixtures, as the plumbing must be functional to pass our final building inspection for occupancy.

January 5 ,2023

Landscape is In

Starting the New Year off with landscaping in, fencing along the retaining wall installed, the parking lot paved and striped. Inside finishing work continues. The cabinets have finally arrived and we're getting ready for installation. 

December 21, 2022

Exterior Signage Installed

Closing out 2022 with the exterior signage on our building installed. We're still awaiting the cabinets in order to pass County inspection, and are hoping that opening in February 2023 is still feasible.

November 17, 2022

Getting Close

We're getting excited to being so close to being move in ready. Hoping for no further delays on cabinetry, which is preventing us from occupancy approval and pushed back our move in date by a month. While you wait, enjoy this 360 aerial video.

November 3, 2022

Drive Thru Graded

ATM double lane drive through views. While we wait for the arrival of the cabinets... grading work on the parking lot is happening. Concrete work on the curbs and walkways is completed. Parking lot lights are in and paving will be up next.

September 30, 2022

Parking Grading

View of the back parking lot for employees. Yay for more parking spaces! This location will have 130 stalls, more than enough room for our members and employees. We're hoping to open to the public in January 2023.

September 16, 2022

Exterior Completed

The exterior walls are finished and look so good! Parking lot work is up next with grading, pouring the concrete curbs and walkways, installing the lights and laying the asphalt. We're loving the glass windows and all of the natural light we'll be getting in the building.

August 25, 2022

Branch Interior

Exterior walls are being finished, work on the parking lot has started and the first coat of paint is on the interior walls. We've been impacted by supply chain and labor shortages like everyone else. Anticipated opening is looking more like January 2023.

July 22, 2022

Exterior Wall Coating

Concrete coat on the exterior walls of the building is going on while interior walls are being painted, tile work is being done in the restrooms, AC duct work is nearing completion. We're looking forward to being able to serve you here by year end.

July 8, 2022

Exterior Glass is In

The interior is taking shape with exterior windows and doors installed. We're shooting to be substantially completed in October, however with supply chain and labor shortages, it's a moving target.

May 26, 2022

Community Room

Our new building will also include a community room with meeting spaces for up to 100 people. In addition to being able to hold all our employees for training sessions, the room will be available to community organizations.

May 11, 2022

Walls are Going Up

Dry wall is going up and window frames are going in. We're facing labor and supply chain shortages like everyone else, but we're still making progress. Hoping to begin serving our community at this location in late fall.

March 11, 2022

Building Topped Off

With the roof of our future main office and Wailuku branch at Kehalani Village Center done, we celebrated the topping off of the building by thanking the contractors and construction workers. 

January 12, 2022

On the 3rd Floor

What's happening on the 3rd floor... flooring is in and exterior walls are up. This floor will house the AC units and storage. Watch this video to peep the views from above.

December 17, 2021

Roof Framed

Steel framing for the roof is nearly complete despite the rain days. Next up is the plywood roof then the water shield. Hoping to top of the building in February 2022.

November 9, 2021

Birdseye View

Checkout this aerial video of the construction site shot by our Project Manager, Will Morrow. Shows the immense amount of steel going onto the rooftop and progress from above.

September 31, 2021

2nd Floor Poured

A huge mahalo to the crew that poured the slab for or second floor. Down below another crew is working on installing the sprinklers on the first floor.

September 18, 2021

2nd Floor Progress

The steel deck pan for the second floor is nearly completed and ready to prep for the concrete pour. Third floor steel deck pan is also going in.

August 29, 2021

Last Beam Installed

The last steel beam for the framing of the building has been signed and in lifted by crane into place. Mahalo to all of the welders who've been working on the building framing.

July 14, 2021

Vault Delivered

The vault has been unloaded panel by panel and installed. This location will offer members three sizes of of safe deposit boxes.

June 18, 2021

Foundation Poured

The Concrete foundation has been poured and is curing. Thank you to all the concrete masons who were up at 2am to get the pour completed in a single day.

February 28, 2021

Retaining Wall Done

The retaining wall is up. CEO and President, Gary Fukuroku, and Vice President, Michele Kawahara, are pictured standing in front of the wall for scale.

January 31, 2021

Grading Beings

Grading work of the site is underway with the big machines being brought in for the heavy work. We love seeing our members helping to build our future home. Keoki's the one operating the huge excavator! 

December 9, 2020

Groundbreaking

Maui County FCU broke ground on the future site of our new headquarters and Wailuku Branch in Kehalani Village Center. The building is anticipated to be completed in mid-2022.